• DocumentCode
    485945
  • Title

    Stalking the Elusive Control Incentives

  • Author

    Senyard, Corley P., Sr. ; Senyard, Thomas J.

  • Author_Institution
    Quad-S Consultants, Inc., P.O. Box 14387, Baton Rouge, Louisiana 70898-4387
  • fYear
    1983
  • fDate
    22-24 June 1983
  • Firstpage
    1147
  • Lastpage
    1152
  • Abstract
    This paper describes an orderly approach to evaluating a supervisory process control project using a ´Control Audit´. The steps involved are outlined. Performance and financial aspects are considered. An example involving a typical distillation column with material balance feedback controls is discussed.
  • Keywords
    Automatic control; Automation; Computer aided instruction; Control systems; Hardware; Process control; Process design; Strontium; Throughput; Valves;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    American Control Conference, 1983
  • Conference_Location
    San Francisco, CA, USA
  • Type

    conf

  • Filename
    4788288