• DocumentCode
    492557
  • Title

    Meeting the operational and logistical challenges of smart meter roll-out - the European experience (“It´s not just hanging meters on walls”)

  • Author

    Borchardt, Frank

  • Author_Institution
    EFR GmbH, Munich, Germany
  • fYear
    2009
  • fDate
    19-19 Feb. 2009
  • Firstpage
    1
  • Lastpage
    20
  • Abstract
    A collection of slides on meeting the operational and logistical challenges of smart meter roll-out by Frank Borchardt, was given.
  • Keywords
    automatic meter reading; logistics; power system management; business process; logistical challenge; operational challenge; smart meter roll out; smart metering;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Smart Metering - Making It Happen, 2009 IET
  • Conference_Location
    London
  • Print_ISBN
    978-1-84919-089-3
  • Type

    conf

  • Filename
    4813952