DocumentCode :
501938
Title :
Reliability-based planning in rural areas; goals, methods, prioritization, and follow-up at Fortum Distribution
Author :
Bengtsson, Per ; Persson, Lars-Ake ; Oberger, Kjell ; Hasselstrom, Jorgen
Author_Institution :
Fortum Distribution AB - Sweden
fYear :
2009
fDate :
8-11 June 2009
Firstpage :
1
Lastpage :
4
Abstract :
In 2005 Fortum Distribution initiated a reliability improvement program in Sweden, denoted SäkraNät. Since then, more than 3000 km of mainly medium voltage overhead lines has been converted to aerial and/or underground cable. In addition, feeder automation and remotely controlled disconnectors has been installed in order to quickly sectionalize faults and restore power upon an interruption. The goal of this paper is to describe the approach Fortum has been using in Sweden to improve reliability in rural and semi-rural areas. The planning process, beginning with goal-formulation, identification of optimal solutions and methods to improve reliability, prioritization and follow-up is described. All finalized reliability projects are followed up and its effect on, e.g., System Average Interruption Duration Index (SAIDI) is measured by comparing recent interruption statistics from historical. The benefit and cost-efficiency of the investments are evaluated and knowledge is transferred back to the planning department for consideration into future projects.
fLanguage :
English
Publisher :
iet
Conference_Titel :
Electricity Distribution - Part 1, 2009. CIRED 2009. 20th International Conference and Exhibition on
Conference_Location :
Prague, Czech Republic
ISSN :
0537-9989
Print_ISBN :
978-1-84919126-5
Type :
conf
Filename :
5255262
Link To Document :
بازگشت