Abstract
The majority of distribution electricity networks were significantly developed in the 60´s and 70´s, requiring the installation of large amounts of MV cables during this period of time. The design life of cables is believed to be around 40-50 years even if most cables are proving to last significantly longer. As the condition of this underground asset is degrading, the utilities will see the investment level required increase in the coming years.
fLanguage
English
Publisher
iet
Conference_Titel
Electricity Distribution - Part 1, 2009. CIRED 2009. 20th International Conference and Exhibition on
Conference_Location
Prague, Czech Republic
ISSN
0537-9989
Print_ISBN
978-1-84919126-5
Type
conf
Filename
5255336
Link To Document