• DocumentCode
    501993
  • Title

    Integrated solution to target MV cable replacement

  • Author

    Chabod, Eleonore ; Dorison, Eric ; Espilit, Thierry ; Michel, Matthieu

  • Author_Institution
    EDF R&D - France
  • fYear
    2009
  • fDate
    8-11 June 2009
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    The majority of distribution electricity networks were significantly developed in the 60´s and 70´s, requiring the installation of large amounts of MV cables during this period of time. The design life of cables is believed to be around 40-50 years even if most cables are proving to last significantly longer. As the condition of this underground asset is degrading, the utilities will see the investment level required increase in the coming years.
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Electricity Distribution - Part 1, 2009. CIRED 2009. 20th International Conference and Exhibition on
  • Conference_Location
    Prague, Czech Republic
  • ISSN
    0537-9989
  • Print_ISBN
    978-1-84919126-5
  • Type

    conf

  • Filename
    5255336