DocumentCode :
502002
Title :
Continuity of supply improvement by means of circuit breakers along MV lines
Author :
Valtorta, Giovanni ; Calone, Roberto ; D´Orazio, Luigi ; Salusest, Vincenzo Giulio
Author_Institution :
ENEL Distribuzione - Italy
fYear :
2009
fDate :
8-11 June 2009
Firstpage :
1
Lastpage :
4
Abstract :
This paper proposes a method to find the most effective point where install a MV circuit breaker along the lines to improve the continuity of supply measured by means of the following indicators: a) cumulative duration of long interruption per LV customer; b) number of long and short interruptions per LV customer. The following pages describe a method to localize the phase to phase short-circuits faults knowing the intervention threshold of the maximum current relay associated to the circuit breaker installed at beginning of MV feeders. The phase-to-phase faults percentage for each MV line and the probability for one fault to occur in a determined distance from the MV bus-bar are evaluated as well. Finally a way to obtain the maximum advantage for the continuity of supply with the use of all mentioned data and information is determined.
fLanguage :
English
Publisher :
iet
Conference_Titel :
Electricity Distribution - Part 1, 2009. CIRED 2009. 20th International Conference and Exhibition on
Conference_Location :
Prague, Czech Republic
ISSN :
0537-9989
Print_ISBN :
978-1-84919126-5
Type :
conf
Filename :
5255360
Link To Document :
بازگشت