Title :
A single machine preemptive scheduling problem with arbitrary release dates and fuzzy due dates
Author :
Yuan, Xie ; Ou, Linlin
Author_Institution :
Sch. of Electr., Shanghai Dianji Univ., Shanghai, China
Abstract :
Preemptive scheduling problem of a single machine subject to arbitrary release dates under uncertain situation is discussed. The release dates of jobs are independence and different with each other. Uncertainty means due dates are not accurate, which can be described by fuzzy set. The memberships of fuzzy due dates denote grade of satisfaction of completion times of corresponding jobs. The objective of the problem is to find an optimal schedule which maximizes the minimal grade of satisfaction of jobs completion times with respect to fuzzy due dates. By extending the method of corresponding problem with accurate due dates into fuzzy situation for the problem, an O(n2) algorithm is presented.
Keywords :
computational complexity; fuzzy set theory; minimisation; single machine scheduling; arbitrary release date; fuzzy due date; fuzzy set; jobs completion time; minimum satisfaction degree maximisation; optimal schedule; single machine preemptive scheduling problem; uncertain situation; Automation; Communication system control; Delay; Fuzzy control; Fuzzy sets; Job shop scheduling; Optimal scheduling; Processor scheduling; Single machine scheduling; Uncertainty; fuzzy due dates; preemption; release times; single machine;
Conference_Titel :
Computing, Communication, Control, and Management, 2009. CCCM 2009. ISECS International Colloquium on
Conference_Location :
Sanya
Print_ISBN :
978-1-4244-4247-8
DOI :
10.1109/CCCM.2009.5267472