DocumentCode
504878
Title
On scheduling a shipbuilding line based on Max-Plus system dynamic representation
Author
Hiroyuki, Kajiwara ; Hitoi, Yasuhiro ; Nakao, Youichi
Author_Institution
Dept. of Marine Syst. Eng., Kyushu Univ., Fukuoka, Japan
fYear
2009
fDate
18-21 Aug. 2009
Firstpage
1738
Lastpage
1741
Abstract
The paper discusses a unified approach to scheduling problems of shipbuilding lines based on linear system representations based on Max-Plus algebra, which makes it possible to solve the scheduling problems to keep delivery dates strictly by adjusting arrival times of parts or materials based on model predictive control theory. It is discussed how to model a complex shipbuilding line consisting of assembly lines and stockyards. Simulation results show that the scheduling problem can be effectively solved.
Keywords
algebra; predictive control; scheduling; ships; Max-Plus algebra; Max-Plus system dynamic representation; assembly lines; linear system representations; model predictive control theory; scheduling problem; shipbuilding line; stockyards; Algebra; Assembly; Construction; Dynamic scheduling; Electronic mail; Linear systems; Marine vehicles; Predictive control; Predictive models; Production; max-plus algebra; model predictive control; scheduling problem; shipbuilding;
fLanguage
English
Publisher
ieee
Conference_Titel
ICCAS-SICE, 2009
Conference_Location
Fukuoka
Print_ISBN
978-4-907764-34-0
Electronic_ISBN
978-4-907764-33-3
Type
conf
Filename
5334861
Link To Document