Multi-shop Rescheduling Problem under Rush Orders
Author :
Hu, Yanhai ; Ye, Feifan ; Guo, Ziqing ; Zheng, Zizhao
Author_Institution :
Fac. of Eng., Ningbo Univ., Ningbo, China
Volume :
3
fYear :
2009
fDate :
14-16 Aug. 2009
Firstpage :
40
Lastpage :
44
Abstract :
Multi-shop rescheduling problem (MSRP) in the condition of rush orders is put forward. Disjunctive graph is employed to demonstrate the MSRP. The weighted mean flow time of both original jobs and rush orders are used as objective function. The weight for rush orders is much bigger than that of original jobs, so the rush orders would be produced as early as possible in the new schedule. Ant colony optimization (ACO) algorithm is used to solve the MSRP. Numerical experiments are conducted. The results demonstrate that the rush orders are processed soon and the original jobs are not delayed much.
Keywords :
job shop scheduling; optimisation; ant colony optimization; disjunctive graph; multishop rescheduling problem; rush orders; Ant colony optimization; Artificial neural networks; Delay; Dispatching; Job production systems; Job shop scheduling; Manufacturing systems; Production systems; Protocols; Uncertainty;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Natural Computation, 2009. ICNC '09. Fifth International Conference on
Conference_Location :
Tianjin
Print_ISBN :
978-0-7695-3736-8
Type :
conf
DOI :
10.1109/ICNC.2009.330
Filename :
5363707
Link To Document :
بازگشت