DocumentCode :
509568
Title :
Incorporating short interruptions and time dependency of interruption costs in continuity of supply regulation
Author :
Kjolle, Gerd ; Samdal, K. ; Brekke, K.
Author_Institution :
SINTEF Energy Res., Trondheim, Norway
fYear :
2009
fDate :
8-11 June 2009
Firstpage :
1
Lastpage :
1
Abstract :
This paper describes the extended incentive based regulation on continuity of supply adopted in Norway as of 2009. The new interruption cost assessment methodology is described incorporating short interruptions and time dependency of interruption costs. Previous studies have shown that annual costs of short interruptions are in the same order as costs of long interruptions, and that the costs are highly time dependent on a weekly and daily basis. Technical and economic consequences of the extended regulation for the network companies are also described.
Keywords :
costing; power supply quality; Norway; interruption cost assessment methodology; long interruption costs; network companies; quality of supply regulation; service reliability; short interruptions; supply regulation continuity; time dependency;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Electricity Distribution - Part 2, 2009. CIRED 2009. The 20th International Conference and Exhibition on
Conference_Location :
Prague
Print_ISBN :
978-1-84919-160-9
Type :
conf
Filename :
5371118
Link To Document :
بازگشت