DocumentCode :
509683
Title :
Microgeneration in Portugal EDP experience and future perspectives
Author :
Goncalves, Rui Miguel Pires
Author_Institution :
EDP Distribui????o, Portugal
fYear :
2009
fDate :
8-11 June 2009
Firstpage :
1
Lastpage :
1
Abstract :
Independent generation has a long history in Portugal. Nevertheless the legal framework for licensing and interconnection was the same for a generator of 1kW and for a 50MW power station. In 2008, DL 363 entered in force and it was specifically aimed for microgeneration: (1) Easy internet registration; (2) Simplified licence; (3) Standard equipment; (4) Up to 3.68kW, initial tariff of 650€/MWh for Photovoltaic (PV) panels, 455€/MWh for wind turbines, decreasing with total microgeneration installed; (5) Total of 10MW allowed during 2008, increasing 20% each year. This new framework got a very enthusiastic response, with all capacity registered.
fLanguage :
English
Publisher :
iet
Conference_Titel :
Electricity Distribution - Part 2, 2009. CIRED 2009. The 20th International Conference and Exhibition on
Conference_Location :
Prague, Czech Republic
Print_ISBN :
978-1-84919-160-9
Type :
conf
Filename :
5371235
Link To Document :
بازگشت