DocumentCode :
509688
Title :
The active use of distributed generation in network planning
Author :
Bollen, M.H.J. ; Hassan, F. ; Wamundsson, M. ; Holm, Allan Hjarbaek ; Ying He
Author_Institution :
STRI AB, Sweden
fYear :
2009
fDate :
8-11 June 2009
Firstpage :
1
Lastpage :
10
Abstract :
This paper addresses ways in which distributed generation can be used to the advantage of network operators. A distinction is thereby made between "non-controlled generation" and "controlled generation". Both types can contribute to an improved performance of the network, where the opportunities for controlled generation are obviously much bigger. It is shown that non-controlled generation can have a positive impact on losses, on undervoltages and on reliability. Controlled generation can further mitigate fast voltage fluctuations, voltage dips and harmonic distortion.
Keywords :
distributed power generation; harmonic distortion; power distribution planning; controlled generation; distributed generation; harmonic distortion; network operator; network planning; noncontrolled generation; voltage dips; voltage fluctuation mitigation;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Electricity Distribution - Part 2, 2009. CIRED 2009. The 20th International Conference and Exhibition on
Conference_Location :
Prague
Print_ISBN :
978-1-84919-160-9
Type :
conf
Filename :
5371241
Link To Document :
بازگشت