DocumentCode
513547
Title
Assembly, integration and testing of CARTOSAT-1
Author
Hariharan, V.K. ; Sundaram, N. Shanmuga ; Dayashankara, K.S. ; Lakshminarayana, V. ; Shrivastava, Anurag Kumar ; Damodaran, Anju ; Gupta, L.N. ; Ganeshan, P.P. ; Velayudhan, M. ; Rao, B. Venkata ; Ghatpande, N.D. ; Danabalan, T.L.
Author_Institution
Syst. Integration Group, ISRO Satellite Centre, Bangalore, India
fYear
2006
fDate
23-24 Feb. 2006
Firstpage
60
Lastpage
66
Abstract
Assembly, Integration and Testing (AIT) is the process in which the subsystems are integrated and tested in a particular sequence to realize the full spacecraft. It involves detailed interface and performance checks to be carried out on different subsystems. The realization of Electro Magnetic Compatibility (EMC) is one of the major tasks while evolving the full spacecraft. This paper briefly describes a list of activities carried out during integration and testing of CARTOSAT-1 spacecraft. It brings out the noise reduction techniques followed to achieve EMC among different subsystems of the spacecraft. The excellent on-orbit performance of IRS-P5 is the final testimony to the measures adopted on ground.
Keywords
aerospace testing; artificial satellites; electromagnetic compatibility; CARTOSAT-1; EMC; assembly, integration and testing; different subsystems; electromagnetic compatibility; noise reduction techniques; on-orbit performance; spacecraft; Assembly systems; Cameras; Electric variables measurement; Electromagnetic compatibility; Magnetic field measurement; Mechanical variables measurement; Noise reduction; Satellites; Space vehicles; System testing;
fLanguage
English
Publisher
ieee
Conference_Titel
ElectroMagnetic Interference and Compatibility (INCEMIC), 2006 Proceedings of the 9th International Conference on
Conference_Location
Bangalore
Print_ISBN
978-1-4244-5203-3
Type
conf
Filename
5419654
Link To Document