DocumentCode :
515121
Title :
An algorithm for improving Shapley Value method for time claim in concurrent delay
Author :
Cui, Dong-hong ; Yao, Li ; Yang, Rong
Author_Institution :
Dept. of Manage., Shenyang Univ. of Technol., Shenyang, China
Volume :
2
fYear :
2010
fDate :
9-10 Jan. 2010
Firstpage :
893
Lastpage :
897
Abstract :
As a special form of construction claims, concurrent delay claim widely exists in construction claim events. At the same time, how to deal with time claim in concurrent delay correctly has became one of the difficult contents in construction claims. Based on Shapely Value method and fuzzy comprehensive evaluation method, this paper presents an ameliorative algorithm for Shapely Value method. In this algorithm, time delay responsibility is allotted to each single responsible activity by Shapley Value, and then allotted between the owner and the contractor in each single responsible activity by means of fuzzy comprehensive evaluation method.
Keywords :
construction industry; contracts; financial management; fuzzy set theory; game theory; Shapley value method; concurrent delay claim; construction claims; fuzzy comprehensive evaluation; time claim; time delay responsibility; Costs; Delay effects; Forward contracts; Game theory; Interference; Large-scale systems; Technology management; Concurrent Delay; Fuzzy Evaluation; Responsibility-allotting; Shapley Value; Time Claim;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Logistics Systems and Intelligent Management, 2010 International Conference on
Conference_Location :
Harbin
Print_ISBN :
978-1-4244-7331-1
Type :
conf
DOI :
10.1109/ICLSIM.2010.5461055
Filename :
5461055
Link To Document :
بازگشت