Title :
Multi-step back-to-back capacitor bank switching in a 115 kV substation
Author :
Suwanasri, Thanapong ; Wattanawongpitak, Sarawut ; Suwanasri, Cattareeya
Author_Institution :
Sirindhorn Int. Thai - German Grad. Sch. of Eng., King Mongkut´´s Univ. of Technol. North Bangkok, Bangkok, Thailand
Abstract :
This paper presents the simulation investigation of multi-step back-to-back capacitor bank switching in a 115 kV substation of the Electricity Generating Authority of Thailand in order to observe inrush current, peak oscillating voltage and frequency of transient oscillation. Different cases are simulated such as energization of 24 MVAR back-to-back capacitor banks up to 5-step with and without the pre-inserted resistor as well as capacitor bank with current limiting reactor. Then the effects of short circuit current and opening the circuit breaker to de-energize the capacitor bank are investigated. Finally, the interesting case occurring in a practical substation with 5-step back-to-back capacitor bank switching is studied. The results are used to evaluate the severity of electrical stresses in electrical system when such switching operations are performed.
Keywords :
current limiters; power capacitors; substations; Electricity Generating Authority; circuit breaker; current limiting reactor; electrical stresses; electrical system; inrush current; multistep back-to-back capacitor bank switching; peak oscillating frequency; peak oscillating voltage; short circuit current; substation; transient oscillation; voltage 115 kV; Capacitors; Circuit simulation; Current limiters; Frequency; Inductors; Power generation; Resistors; Substations; Surges; Voltage;
Conference_Titel :
Electrical Engineering/Electronics Computer Telecommunications and Information Technology (ECTI-CON), 2010 International Conference on
Conference_Location :
Chaing Mai
Print_ISBN :
978-1-4244-5606-2
Electronic_ISBN :
978-1-4244-5607-9