Title :
Research on material substitution algorithm during the complex equipment assembling process
Author_Institution :
Sch. of Mech. Eng., Dalian Fisheries Univ., Dalian, China
Abstract :
Aiming at material kitting and substitution reduced by production changes during complex equipment production process and by analysis of material requirements harmony among product BOM, process planning BOM and production planning BOM, the model of material substitution has been established with materials kitting constraint. By using cost-minimizing as optimized purpose and according to material different attributes(design attributes, process attributes and planning attributes) as contain parameters of materials institution, an algorithm rule is designed to select part substitution to make materials selection, match and institution come true and ensure required materials arrived sufficiently and timely. Finally, the solution is proven to be reasonable and effective in an application example.
Keywords :
assembly planning; bills of materials; process planning; complex equipment assembling process; complex equipment production process; material kitting constraint; material requirement; material substitution algorithm; process planning BOM; production planning BOM; Aerospace materials; Aircraft; Algorithm design and analysis; Assembly systems; Bills of materials; Costs; Job shop scheduling; Manufacturing processes; Process planning; Production planning; Assembling; Materials Kitting; Substitution;
Conference_Titel :
Computer Design and Applications (ICCDA), 2010 International Conference on
Conference_Location :
Qinhuangdao
Print_ISBN :
978-1-4244-7164-5
Electronic_ISBN :
978-1-4244-7164-5
DOI :
10.1109/ICCDA.2010.5541419