DocumentCode
525930
Title
Notice of Retraction
Optimization of development plan of weapon system based on general performance
Author
Yao De-Yi ; Wang Tao
Author_Institution
Dept. of Basic Courses, PLA CGXY, Bengbu, China
Volume
2
fYear
2010
fDate
12-13 June 2010
Firstpage
68
Lastpage
71
Abstract
Notice of Retraction
After careful and considered review of the content of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE´s Publication Principles.
We hereby retract the content of this paper. Reasonable effort should be made to remove all past references to this paper.
The presenting author of this paper has the option to appeal this decision by contacting TPII@ieee.org.
Aiming at the shortcoming of paying attention only to the combat performance and life cycle cost(LCC)during evaluating development plan of weapon systems, this paper establishes evaluation indicators of general performance of weapon systems, and uses grey interrelated analysis method to evaluate and optimize. This paper also brings forward a new weight determination method based on Euclidean Distance to improve it on the basis of analyzing the defects of classic grey interrelated analysis method, which avoids Subjective factors and makes the evaluation results more objective and accurate. Finally through an example in the practice of development project of defense equipment, the method´s specific applications are introduced and the feasibility and effectiveness of this method verified.
After careful and considered review of the content of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE´s Publication Principles.
We hereby retract the content of this paper. Reasonable effort should be made to remove all past references to this paper.
The presenting author of this paper has the option to appeal this decision by contacting TPII@ieee.org.
Aiming at the shortcoming of paying attention only to the combat performance and life cycle cost(LCC)during evaluating development plan of weapon systems, this paper establishes evaluation indicators of general performance of weapon systems, and uses grey interrelated analysis method to evaluate and optimize. This paper also brings forward a new weight determination method based on Euclidean Distance to improve it on the basis of analyzing the defects of classic grey interrelated analysis method, which avoids Subjective factors and makes the evaluation results more objective and accurate. Finally through an example in the practice of development project of defense equipment, the method´s specific applications are introduced and the feasibility and effectiveness of this method verified.
Keywords
defence industry; life cycle costing; optimisation; weapons; Euclidean distance; defense equipment development project; development plan optimization; grey interrelated analysis; life cycle cost; weapon system; Correlation; Indexes; Security; Weapons; development plan of weapon systems; factors proportion; general performance; improved grey interrelated analysis method; program optimization;
fLanguage
English
Publisher
ieee
Conference_Titel
Computer and Communication Technologies in Agriculture Engineering (CCTAE), 2010 International Conference On
Conference_Location
Chengdu
Print_ISBN
978-1-4244-6944-4
Type
conf
DOI
10.1109/CCTAE.2010.5544039
Filename
5544039
Link To Document