• DocumentCode
    528437
  • Title

    Construction time-cost-quality trade-off based on genetic algorithms under resource restriction

  • Author

    Zheng, Xiao ; Mao, Qingyun

  • Author_Institution
    Sch. of Econ. & Manage., Jiangxi Univ. of Sci. & Technol., Ganzhou, China
  • Volume
    1
  • fYear
    2010
  • fDate
    June 29 2010-July 1 2010
  • Firstpage
    188
  • Lastpage
    191
  • Abstract
    There are three project´s control goals which are time, cost and quality, those are interdependent each other. The desired result of project optimization is achieving a station that the duration is reasonable; cost is low and quality is high. In this paper, we developed a comprehensive and balanced model of quality-cost-time optimization model under resource constraints, and introduced the genetic algorithm to solve the model. Through an application example of the actual construction schedule, we obtained a comprehensive and balanced option of project quality-cost-time optimization.
  • Keywords
    construction; genetic algorithms; project management; construction time-cost-quality trade-off; genetic algorithm; project optimization; resource restriction; Gallium nitride; genetic algorithm; model; project management; project optimization;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Communication Systems, Networks and Applications (ICCSNA), 2010 Second International Conference on
  • Conference_Location
    Hong Kong
  • Print_ISBN
    978-1-4244-7475-2
  • Type

    conf

  • DOI
    10.1109/ICCSNA.2010.5588683
  • Filename
    5588683