Title :
Notice of Retraction
Simulation verification for the lifting of the overhead crane
Author :
Ya Huang ; Zong-Sheng Cao ; Jia Wang ; Ke-Ming Pu ; Wei Wang
Author_Institution :
Beijing Special Eng. Design & Res. Inst., Beijing, China
Abstract :
Notice of Retraction
After careful and considered review of the content of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE´s Publication Principles.
We hereby retract the content of this paper. Reasonable effort should be made to remove all past references to this paper.
The presenting author of this paper has the option to appeal this decision by contacting TPII@ieee.org.
Overhead crane flip and lift by controlling the height of the main hook and the vice hook. The whole process involves in nine objects, such as crane carriage, crane girder, main hook, vice hook, etc. In order to analyze the movement state of each device in the lifting process, this paper design and realize a simulation system, which is based on the virtual simulation platform-quest3D. This system adopts the cascade control method to achieve the linkage among number of devices, and thus supports the real-time simulation by physical stress analysis combined with Matlab computing. Simulation results verify the effectiveness of design of the overhead crane.
Keywords :
civil engineering computing; cranes; formal verification; lifting; real-time systems; Matlab computing; cascade control method; crane carriage; crane girder; lifting process; main hook; overhead crane; overhead crane flip; physical stress analysis; real-time simulation; simulation verification; vice hook; Cranes; Structural beams; Switches; cascade; motion range constraints; simulation;
Conference_Titel :
Computer Application and System Modeling (ICCASM), 2010 International Conference on
Conference_Location :
Taiyuan
Print_ISBN :
978-1-4244-7235-2
DOI :
10.1109/ICCASM.2010.5622590