• DocumentCode
    535632
  • Title

    Power system loss reduction through TCSC economic installation considering switching loss

  • Author

    Gitizadeh, M. ; Khalilnezhad, H.

  • Author_Institution
    Dept. of Electr. & Electron. Eng., Shiraz Univ. of Technol., Shiraz, Iran
  • fYear
    2010
  • fDate
    Aug. 31 2010-Sept. 3 2010
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    In this paper it is desired to find TCSC (Thyristor-Controlled Series Compensator) economical installation procedure in order to decrease power system losses. Not only the power losses will be reduced, but also TCSC switching loss is considered and modeled to constitute the whole cost function. The degree of compensation and location of TCSC with and without switching loss will be compared in order to determine the importance of such losses on TCSC installation parameters. Finally, the results of simulation on IEEE 14-Bus test system which utilizes the Genetic Algorithm method to solve the problem are presented. The proposed solution procedure is able to pass the local optimums toward the global optimum solution.
  • Keywords
    compensation; genetic algorithms; power system economics; switching convertors; thyristor applications; IEEE 14-bus test system; TCSC economic installation; economic installation; genetic algorithm; power system loss reduction; switching loss; thyristor-controlled series compensator; Immune system; Investments; Power capacitors; Power systems; Resistance; Switching loss; Thyristors; Genetic algorithm; Loss reduction; Optimum parameter setting; Switching loss; TCSC;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Universities Power Engineering Conference (UPEC), 2010 45th International
  • Conference_Location
    Cardiff, Wales
  • Print_ISBN
    978-1-4244-7667-1
  • Type

    conf

  • Filename
    5649348