Title :
Research on risk assessment of dam removal
Author_Institution :
Bus. Sch., Hohai Univ., Nanjing, China
Abstract :
This paper identifies the risks of removing dams and sorts the risks into five categories, namely, life risk, economic risk, technological risk, environmental risk and social risk. On this basis, this paper builds a risk index system of removing dams. By using TOPSIS-AHP model, the paper constructs a risk assessment model of dam removal.
Keywords :
dams; decision making; risk management; TOPSIS-AHP model; analytic hierarchy process; dam removal; economic risk; environmental risk; life risk; risk assessment model; risk index system; social risk; technological risk; Biological system modeling; dam removal; risk assessment; risk management;
Conference_Titel :
Future Information Technology and Management Engineering (FITME), 2010 International Conference on
Conference_Location :
Changzhou
Print_ISBN :
978-1-4244-9087-5
DOI :
10.1109/FITME.2010.5654724