DocumentCode
536306
Title
A heuristic algorithm of spaceborn TT&C Resources Scheduling
Author
Liu, Jian-Ping ; Li, Jing ; Bai, Jian ; Yu, Pei-Jun
Author_Institution
State Key Lab. of Astronaut. Dynamics, Xi´´an Satellite Control Center, Xi´´an, China
Volume
1
fYear
2010
fDate
29-31 Oct. 2010
Firstpage
180
Lastpage
182
Abstract
Spaceborn Tracking Telemetry and Command (TT&C) Resources Scheduling is a constraint satisfaction problem based complicated more tasks and more resources and more windows. Considering general task requirements and spaceborn TT&C characteristics about more available passes and longer visible window time, a heuristic algorithm of spaceborn TT&C resources scheduling is proposed in this paper. In this heuristic algorithm, a initial ground resources scheduling table is obtained by ground TT&C resources scheduling based on task priorities. Firstly, from this initial table, spaceborn TT&C resources based on back free time are scheduled for a spaceborn resources scheduling table. Secondly, from this resource scheduling table, spaceborn TT&C resources based on conflict resolving are scheduled. The simulation results indicate this heuristic algorithm is valid.
Keywords
artificial satellites; ground support systems; heuristic programming; resource allocation; scheduling; task analysis; back free time; constraint satisfaction problem; ground resources scheduling table; heuristic algorithm; spaceborn TT&C resources scheduling; spaceborn tracking telemetry; task priority; visible window time; Resource scheduling; TDRSS; TT&C; back free time;
fLanguage
English
Publisher
ieee
Conference_Titel
Intelligent Computing and Intelligent Systems (ICIS), 2010 IEEE International Conference on
Conference_Location
Xiamen
Print_ISBN
978-1-4244-6582-8
Type
conf
DOI
10.1109/ICICISYS.2010.5658652
Filename
5658652
Link To Document