DocumentCode :
536495
Title :
Risk Integrated Assessment of the Project Progress and Cost Based on Entropy and the Random Network
Author :
Wang Yungang ; Wang Hua
Author_Institution :
Sch. of Manage., Shenyang Univ. of Technol., Shenyang, China
fYear :
2010
fDate :
7-9 Nov. 2010
Firstpage :
1
Lastpage :
5
Abstract :
During the construction process, the project progress would be affected by the various indeterminate factors inevitably, which may cause increased risk of engineering postpone or difficulty in cost control. Maximum entropy principle was introduced into project risk management by studying information entropy and random network theory, which was applied in project schedule and cost control. And it was analyzed in entropy theory´s angle. The combined risk control model was established based on the principles of maximum entropy and GERT, and the probability density function of construction period was obtained by this model. Then probability density function of the cost was derived and completion rate in the required time was obtained by the model. And last through a case study prove that the entropy theory has the good function and maneuver abilities in work project control with the software programming and provide a new method for the progress and the cost control.
Keywords :
maximum entropy methods; probability; project management; risk management; construction process; information entropy; maximum entropy principle; probability density function; project risk management; project schedule; random network theory; risk control model; risk integrated assessment; Biological system modeling; Entropy; Mathematical model; Presses; Probability density function; Random variables; Schedules;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
E-Product E-Service and E-Entertainment (ICEEE), 2010 International Conference on
Conference_Location :
Henan
Print_ISBN :
978-1-4244-7159-1
Type :
conf
DOI :
10.1109/ICEEE.2010.5660192
Filename :
5660192
Link To Document :
بازگشت