DocumentCode
537947
Title
The verification of during the challenge for railway signaling systems
Author
Jeong, Rag-Gyo ; Kim, Beak-Hyeon ; Koo, Ja-Sung
Author_Institution
Signaling & Electr. Eng. Res. Dept., Korea Railroad Res. Inst. (KRRI), Uiwang, South Korea
fYear
2010
fDate
10-13 Oct. 2010
Firstpage
1996
Lastpage
1999
Abstract
Until now, in railway signaling system the conventional wayside signal mode has been used generally. There are, however, the risk of accidents such as human mistakes caused by that the driver identifies the signal lamp status and controls train speed with the naked eye. It is also necessary to refurbish the obsolete system. Thereby, it is being effective that the onboard signal mode has been recently introduced and applied in order to transmit the speed control information to train by using the computer and communication equipment. It is necessary to switch over the system in a way while providing passengers with an operation service to replace the obsolete signal system. In this paper, Will be verify the cases through trial assessment which are solved by the way of adding specific functionalities(TODS) in the problems of interference among the procedure of switch-over processes and a serial of processes for system verification while a train is operated in the new system in parallel to the existing system.
Keywords
railway engineering; velocity control; communication equipment; obsolete signal system; railway signaling system; signal lamp status; switch over process; train speed control;
fLanguage
English
Publisher
ieee
Conference_Titel
Electrical Machines and Systems (ICEMS), 2010 International Conference on
Conference_Location
Incheon
Print_ISBN
978-1-4244-7720-3
Type
conf
Filename
5664048
Link To Document