DocumentCode :
539363
Title :
Impacts of small lot manufacturing on AMHS
Author :
Kondo, Hiroshi
Author_Institution :
Asyst Technologies Japan, Inc., Ise-city, Mie prif., Japan
fYear :
2008
fDate :
27-29 Oct. 2008
Firstpage :
93
Lastpage :
96
Abstract :
Demands to reduce semiconductor fab lot cycle time are increasing more and more. Small lot manufacturing (SLM) is proposed as a promising way to reduce cycle times considerably. However there are detractors against realizing effective SLM. Some of them are related to Automated Manufacturing Handling System (AMHS). This paper describes these detractors and discuss potential solutions for them. We conclude that AMHS solutions for SLM should stress more transport capacity and shorter Carrier Exchange Time (CET) rather than shorter delivery time. We also conclude that mathematical models are more intuitive and useful than simulation models for such studies.
Keywords :
Approximation methods; Manufacturing; Markov processes; Mathematical model; Probability; Production facilities; Stress;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Semiconductor Manufacturing (ISSM), 2008 International Symposium on
Conference_Location :
Tokyo, Japan
ISSN :
1523-553X
Electronic_ISBN :
1523-553X
Type :
conf
Filename :
5714880
Link To Document :
بازگشت