• DocumentCode
    539372
  • Title

    Fully automation control system for golden super hot lot in 300mm Fab

  • Author

    Wu, De-Lung ; Lo, Hsi-Lo ; Pan, Cheng-Chung

  • Author_Institution
    Rexchip Semiconductor Corp., NO.429-1, SANFONG RD., HOULI TOWNSHIP, TAICHUNG COUNTY, CENTRAL TAIWAN SCIENCE PARK, TAIWAN, R.O.C.
  • fYear
    2008
  • fDate
    27-29 Oct. 2008
  • Firstpage
    99
  • Lastpage
    102
  • Abstract
    This paper purpose is for the highest priority super hot lot (golden lot) to reduce its cycle time. We develop the system called as advanced golden super hot lot management system. This system is already implemented in the REXCHIP 300mm Fab. The purpose of project is to use automated method to shorten lot cycle time to verify the process and speed up product pilot run period. After fully automation control system implemented in our 300mm Fab, our project got good results. The golden lot average output cycle time from 30 days to 16 days. The cycle time reduced about 47%. The benefits of the project are that decrease the influence to the bottleneck tool lowest and the process´s verification become more speed.
  • Keywords
    Automation; Dispatching; Electronic mail; Forecasting; Manufacturing; Mathematical model; Real time systems; cycle time; golden lot; golden-line; real time dispatcher; super hot lot;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Semiconductor Manufacturing (ISSM), 2008 International Symposium on
  • Conference_Location
    Tokyo, Japan
  • ISSN
    1523-553X
  • Electronic_ISBN
    1523-553X
  • Type

    conf

  • Filename
    5714893