• DocumentCode
    539373
  • Title

    Throughput improvement with setup reduction focusing on process identification

  • Author

    Kobayashi, Yoshiaki ; Hayamizu, Taichi ; Sakai, Katsuhisa

  • Author_Institution
    Renesas Technology Corp., 751, Horiguchi, Hitachinaka-shi, Ibaraki-ken, 312-8504, Japan
  • fYear
    2008
  • fDate
    27-29 Oct. 2008
  • Firstpage
    107
  • Lastpage
    110
  • Abstract
    We improved throughput by reducing operational loss that occurs owing to the process condition change in semiconductor manufacturing equipments. As a result of Equipment Engineering System (EES) data analysis, we found that it took time from several to ten percent of Raw Processing Time to adjust etchers Electrostatic Chuck (ESC) temperature. Controlling ESC temperature of each recipe based on process flow and process information, and processing the same ESC temperature process consecutively for a certain period have resulted in throughput improvement in etching process by up to 7 percent and by 4 percent on average.
  • Keywords
    Dispatching; Etching; Manufacturing; Process control; Productivity; Temperature measurement; Throughput;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Semiconductor Manufacturing (ISSM), 2008 International Symposium on
  • Conference_Location
    Tokyo, Japan
  • ISSN
    1523-553X
  • Electronic_ISBN
    1523-553X
  • Type

    conf

  • Filename
    5714894