DocumentCode
539373
Title
Throughput improvement with setup reduction focusing on process identification
Author
Kobayashi, Yoshiaki ; Hayamizu, Taichi ; Sakai, Katsuhisa
Author_Institution
Renesas Technology Corp., 751, Horiguchi, Hitachinaka-shi, Ibaraki-ken, 312-8504, Japan
fYear
2008
fDate
27-29 Oct. 2008
Firstpage
107
Lastpage
110
Abstract
We improved throughput by reducing operational loss that occurs owing to the process condition change in semiconductor manufacturing equipments. As a result of Equipment Engineering System (EES) data analysis, we found that it took time from several to ten percent of Raw Processing Time to adjust etchers Electrostatic Chuck (ESC) temperature. Controlling ESC temperature of each recipe based on process flow and process information, and processing the same ESC temperature process consecutively for a certain period have resulted in throughput improvement in etching process by up to 7 percent and by 4 percent on average.
Keywords
Dispatching; Etching; Manufacturing; Process control; Productivity; Temperature measurement; Throughput;
fLanguage
English
Publisher
ieee
Conference_Titel
Semiconductor Manufacturing (ISSM), 2008 International Symposium on
Conference_Location
Tokyo, Japan
ISSN
1523-553X
Electronic_ISBN
1523-553X
Type
conf
Filename
5714894
Link To Document