DocumentCode :
539374
Title :
Win-win approach between Tool productivity and delivery fulfillment by Carpool execution
Author :
Lee, Yih-Yi ; Chen, Jun-Nan ; Hsiao, CJ
Author_Institution :
Taiwan Semiconductor Manufacturing Company, Ltd., No. 1-1,Nan-Ke N, Rd., Science-Based Industrial Park, Tainan, Taiwan
fYear :
2008
fDate :
27-29 Oct. 2008
Firstpage :
111
Lastpage :
114
Abstract :
In a rapid changing business environment, time to market is very critical for better service to our customers. Moreover, shorten the time to market and elevate the timing accuracy would be very helpful for risk management and resource reservation. It is important for semiconductor foundry to ensure the tool capacity is fully utilized with respect to expensive CAPEX. Therefore, proper dispatching for foundry fab production line management plays an important role to maintain a win-win situation between tool productivity and delivery fulfillment. Good priority follow rate leads to accurate delivery. The side effect is recipe changing will be too frequent. This paper demonstrates the Carpool concept to achieve the win-win between Tool productivity and delivery fulfillment in foundry environment. This concept was embedded in the real-time dispatching mechanisms to conduct the experiment. One demo tool efficiency was improved around 3%∼4% while the lost time kept almost the same. (Based on same utilization level, the delivery accuracy also kept > 95% during the period).
Keywords :
Accuracy; Dispatching; Manufacturing; Process control; Productivity; Quality control; Safety;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Semiconductor Manufacturing (ISSM), 2008 International Symposium on
Conference_Location :
Tokyo, Japan
ISSN :
1523-553X
Electronic_ISBN :
1523-553X
Type :
conf
Filename :
5714895
Link To Document :
بازگشت