DocumentCode :
541194
Title :
A load shedding method based on the power vacancy sensitivity analysis
Author :
Xu Shan ; Tang Zhe
Author_Institution :
Nanjing Power Supply Co., Nanjing, China
fYear :
2010
fDate :
13-16 Sept. 2010
Firstpage :
1
Lastpage :
5
Abstract :
The loss of a large capacity power plant or extra-high voltage transmission line in weak-connected power system may cause abundant power vacancy of consumer district. As a result, the system frequency will drop sharply. This paper presented a load-shedding method which is based on the power vacancy sensitivity analysis. Refer to the network structure after fault, it first calculates the sensitivity of power vacancy to load power and carries out the load-shedding according to the descending sequence of the sensitivity values, and then determines the load-shedding amount by the time-domain simulation method. As the precaution before the traditional UFLS (Under Frequency Load Shedding) method, this method could effectively raise the system frequency with minimal load-shedding. EPRI-36 system is used to demonstrate the efficiency of the method.
Keywords :
load shedding; sensitivity analysis; time-domain analysis; EPRI-36 system; extra-high voltage transmission line; large capacity power plant; network structure; power vacancy sensitivity analysis; time-domain simulation method; under frequency load shedding method; weak-connected power system; Analytical models; Gold; Load modeling; Loss measurement; Time frequency analysis; Voltage measurement; load shedding; power system; power vacancy; sensitivity analysis;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Electricity Distribution (CICED), 2010 China International Conference on
Conference_Location :
Nanjing
Print_ISBN :
978-1-4577-0066-8
Type :
conf
Filename :
5735895
Link To Document :
بازگشت