DocumentCode
541307
Title
The selection strategy on the main parts of transformer and its performance parameters
Author
Weiping, A. Ma ; Lixue, B. Ma ; Fangxiao, C. Cheng ; Ming, D. Ao
Author_Institution
Jilin Electr. Power Res. Inst., Changchun, China
fYear
2010
fDate
13-16 Sept. 2010
Firstpage
1
Lastpage
6
Abstract
The selection strategy on the main parts of transformer and its performance parameters are directly related to the transformer´s reliable operation,security and economic. After investigations and analysis, some suggestions are made: the capacity and quantity of bushing current transformers should be selected reasonably; the present transformer´s fire-protection devices should be removed, and most of the main transformer´s tap-changer in power plant should be cancelled; in the premise of not increasing the costs of manufacturing, as the operation load rate of transformer, adjust the ratio between the no-load loss and load loss in order to get the transformer´s operation economically and reasonably.
Keywords
bushings; current transformers; fires; on load tap changers; power generation reliability; power transformer protection; bushing current transformer; performance parameter; power plant; reliability; tap-changer; transformer fire-protection device; transformer parts selection; transformer security; Fires; Green products; Insulators; Lead; Manufacturing; Nitrogen; Performance evaluation; Selection strategy; Transformer; fire-protection devices; running load factor; tap-changer;
fLanguage
English
Publisher
ieee
Conference_Titel
Electricity Distribution (CICED), 2010 China International Conference on
Conference_Location
Nanjing
Print_ISBN
978-1-4577-0066-8
Type
conf
Filename
5736015
Link To Document