Title :
Design of intelligent fault diagnosis system for energy remote terminal unit based on agent technology
Author :
Wu, Shaocheng ; Zhou, Shangli ; Li, Jia
Author_Institution :
Electr. Power Res. Inst., Guangdong Power Grid Corp., Guangzhou, China
Abstract :
In recent years, Guangdong Power Grid Corporation has built the largest scale electric energy telemetering system in China. More than 400,000 field units had been put into use in Guangdong province. With the scale of system becoming larger, the municipal power supply bureau faces more impression of maintenance work load. In order to decrease the maintenance work load, we have designed and implemented the intelligent fault diagnosis system for field terminal unit based on multi-agent. By using multi-agent technology, the flexible intelligent communication protocol interface and optimal load balancing policy are designed to tackle the problems of various communication protocols and heavy network loads. The production rule knowledge representation is used to build diagnosis knowledge database. The system realized the function of communication monitor and on-line fault-diagnosis, which decreased maintenance work load a lot.
Keywords :
fault diagnosis; multi-agent systems; power engineering computing; power system measurement; telemetry; electric energy telemetering system; energy remote terminal unit; intelligent communication protocol interface; intelligent fault diagnosis system; maintenance work load; multi-agent technology; on-line fault-diagnosis; optimal load balancing policy; production rule knowledge representation; Electricity; Fault diagnosis; Knowledge based systems; Maintenance engineering; Monitoring; Protocols; Field unit; agent technology; electric energy telemetering system; fault diagnosis;
Conference_Titel :
Electricity Distribution (CICED), 2010 China International Conference on
Conference_Location :
Nanjing
Print_ISBN :
978-1-4577-0066-8