• DocumentCode
    547534
  • Title

    Simultaneous scheduling of energy & spinning reserve considering customer and supplier choice on reliability

  • Author

    Khodayari, M. ; Mahdavi, M. ; Monsef, H.

  • Author_Institution
    Sch. of ECE, Univ. of Tehran, Tehran, Iran
  • fYear
    2011
  • fDate
    17-19 May 2011
  • Firstpage
    1
  • Lastpage
    6
  • Abstract
    In this paper, a new model is proposed for simultaneous clearing of energy and reserve market considering generation deficiencies and transmission constraints where the reserve capacity is scheduled based on the desired risk level of customers and suppliers, that is recognized by the expected load not supplied (ELNS) index and expected power not served (EPNS) criterion. Also, the required reserve allocated to generators is calculated separately, i.e., part of reserve is allocated to generation deficiencies and the rest of it is considered for transmission restrictions. Therefore, this method produces market-clearing results with the desired probabilistic characteristics. For illustrating the efficiency of proposed technique, it is applied to the Roy Billinton test system (RBTS) and results are analyzed.
  • Keywords
    power markets; Roy Billinton test system; energy clearing; energy scheduling; expected load not supplied index; expected power not served criterion; generation deficiency; market-clearing results; probabilistic characteristics; reserve market; supplier choice; transmission constraint; transmission restriction; Generators; Indexes; Power system reliability; Probabilistic logic; Reliability; Spinning; Strontium; ELNS; EPNS; Energy and spinning reserve;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Electrical Engineering (ICEE), 2011 19th Iranian Conference on
  • Conference_Location
    Tehran
  • Print_ISBN
    978-1-4577-0730-8
  • Electronic_ISBN
    978-964-463-428-4
  • Type

    conf

  • Filename
    5955422