DocumentCode
547859
Title
Simultaneous scheduling of energy & spinning reserve considering customer and supplier choice on reliability
Author
Khodayari, Mohsen ; Mahdavi, Mehdi ; Monsef, Hassan
Author_Institution
University of Tehran
fYear
2011
fDate
17-19 May 2011
Firstpage
1
Lastpage
1
Abstract
Summary from only given. In this paper, a new model is proposed for simultaneous clearing of energy and reserve market considering generation deficiencies and transmission constraints where the reserve capacity is scheduled based on the desired risk level of customers and suppliers, that is recognized by the expected load not supplied (ELNS) index and expected power not served (EPNS) criterion. Also, the required reserve allocated to generators is calculated separately, i.e., part of reserve is allocated to generation deficiencies and the rest of it is considered for transmission restrictions. Therefore, this method produces market-clearing results with the desired probabilistic characteristics. For illustrating the efficiency of proposed technique, it is applied to the Roy Billinton test system (RBTS) and results are analyzed.
Keywords
ELNS; EPNS; Energy and spinning reserve;
fLanguage
English
Publisher
ieee
Conference_Titel
Electrical Engineering (ICEE), 2011 19th Iranian Conference on
Conference_Location
Tehran
Print_ISBN
978-1-4577-0730-8
Type
conf
Filename
5955749
Link To Document