DocumentCode :
555544
Title :
Research on EPCM project procurement risk based on TOPSIS and RBF method
Author :
Bi, Xing ; Xie, Liang ; Mao, Cui
Author_Institution :
Sch. of Manage. & Econ., Tianjin Univ., Tianjin, China
Volume :
Part 1
fYear :
2011
fDate :
3-5 Sept. 2011
Firstpage :
177
Lastpage :
180
Abstract :
Procurement is a core link under the EPCM model. Identifying and analyzing procurement risk is of significance to make sensible procurement decision. This paper analyzes the procurement risk under the EPCM model at first. According to the above, the writer proposed a procurement risk assessment model based on TOPSIS and RBF method, and connected with the engineering examples, made empirical analysis based on a certain amount of project procurement statistics data. The whole research shows that the new method leads to a more efficient and exact assessment for the procurement risk under the EPCM model, and meanwhile, it could provide strong support structure for the implementation of integrated procurement risk management and the establishment of financial risk early warning mechanism.
Keywords :
construction; financial management; procurement; project management; risk management; EPCM project procurement risk; RBF method; TOPSIS; empirical analysis; engineering procurement construction management; financial risk early warning mechanism; integrated procurement risk management; project procurement statistics data; Contracts; Indexes; Materials; Procurement; Risk management; Supply chains; Training; Assessment; EPCM; Procurement Risk; Supply Chain;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industrial Engineering and Engineering Management (IE&EM), 2011 IEEE 18Th International Conference on
Conference_Location :
Changchun
Print_ISBN :
978-1-61284-446-6
Type :
conf
DOI :
10.1109/ICIEEM.2011.6035134
Filename :
6035134
Link To Document :
بازگشت