Title :
Method study of calculating and controlling work-in-process
Author :
Song, Xiao-yan ; Wu, Lang
Author_Institution :
Dept. of Ind. Eng., GAA (H.K) Ltd., Dong Guan, China
Abstract :
The focus of this paper is to study two methods of calculating the work-in-process as applied to manufacturing system. A teamwork chart is given to figure out the composing and related quantity of work-in-process when we focus on comparatively simple process or parts of a complex process. But when we focus on more complex production process, an I-O curve is introduced instead of teamwork for more easily studying the quantity of work-in-process. Moreover, the paper discusses the main factors which affect the quantity of the work-in-process and illustrates how to better control and monitor them.
Keywords :
manufacturing systems; team working; I-O curve; complex production process; manufacturing system; teamwork chart; work-in-process; Data models; Manufacturing systems; Materials; Mathematical model; Monitoring; Teamwork; Cycle Time; I-O Curve; Lead Time; Teamwork Chart; Work-In-Process;
Conference_Titel :
Industrial Engineering and Engineering Management (IE&EM), 2011 IEEE 18Th International Conference on
Conference_Location :
Changchun
Print_ISBN :
978-1-61284-446-6
DOI :
10.1109/ICIEEM.2011.6035261