    Sizing and selection of grounding transformers-decision criteria

  • Author

    Eduful, George ; Mensah, Godfred

  • Author_Institution
    Syst. Planning Div., Electr. Co. of Ghana, Accra-North, Ghana
  • fYear
    2011
  • fDate
    7-10 Nov. 2011
  • Firstpage
    45
  • Lastpage
    49
  • Abstract
    Within a period of two years, the Electricity Company of Ghana (ECG) lost a total of six grounding transformers in a particular substation. The situation created a lot of instability and resulted in huge productivity losses to both the company and its customers. The failures were believed to be related to wrong selection of grounding transformer rating. However, using the concept of capacitive charging current of a system, it was found that the short time rating of the grounding transformers were rightly selected. Analysis of the phenomenon strongly linked the damages to protection deficiency. This paper discusses analysis of the problem and proposes decision criteria for selecting a grounding transformer.
  • Keywords
    decision making; earthing; power system protection; power transformers; substations; Electricity Company of Ghana; capacitive charging current; decision criteria; grounding transformer rating; grounding transformer selection; grounding transformer sizing; productivity loss; protection deficiency; Cable insulation; Grounding; Resistance; Transient analysis; Voltage control; Capacitive charging current; Grounding transformer; Zero sequence impedance; short time rating current;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Sustainable Technologies (WCST), 2011 World Congress on
  • Conference_Location
    London
  • Print_ISBN
    978-1-4577-1311-8
  • Type

    conf

  • Filename
    6114236