Title :
The post-evaluation index system for preparatory work of transmission and transformation projects
Author :
Ma, Xiufan ; Lu, Siyao ; Zhou, Ying
Author_Institution :
North China Electr. Power Univ., Beijing, China
Abstract :
Considering the characteristics of the transmission and transformation project, focusing on the wink links of the preparatory work, this paper builds the post-evaluation index system of preparatory work. In accordance with the interactional relationship among the indexes, the Analytic Hierarchy Process (AHP) based evaluation model is introduced to confirm the weight of indexes. Finally, the results of an empirical analysis on a certain transmission and transformation project´s preparatory work show that this index system can dig up some key problems in preliminary management and give a good reference for subsequent projects decision-making and management level.
Keywords :
decision making; power transmission; AHP; analytic hierarchy process; decision-making; empirical analysis; index system; management level; post-evaluation index system; transformation projects; transmission preparatory work; Contracts; Decision making; Educational institutions; Indexes; Planning; Power transmission; index system; post-evaluation; preparatory work; transmission and transformation project;
Conference_Titel :
Power Engineering and Automation Conference (PEAM), 2011 IEEE
Conference_Location :
Wuhan
Print_ISBN :
978-1-4244-9691-4
DOI :
10.1109/PEAM.2011.6134875