• DocumentCode
    568044
  • Title

    Analysis of three kinds of quick startup tests on an S-band Klystron

  • Author

    Shen, Baoli ; Huang, Yunping ; Zhang, Zhaochuan

  • Author_Institution
    Key Lab. of High Power Microwave Sources & Technol., Inst. of Electron., Beijing, China
  • fYear
    2012
  • fDate
    23-27 July 2012
  • Firstpage
    215
  • Lastpage
    216
  • Abstract
    Three different kinds of 4 min quick startup tests on an S-band klystron are performed in order to find out the beam emission and output power performance of the klystron In the first 4mins, the current of the heater is set to different values, and at the 5th minute the klystron starts up. The results show that the klystron can work steadily, and from the 5th to the 15th minute the beam average current and the output power are slowly increased, but less than the full values It´s concluded that the 4mins quick startup can satisfy the demand for an emergency of the klystron, but it isn´t used often because of the decrease of the cathode´s lifetime.
  • Keywords
    cathodes; klystrons; microwave tubes; testing; S-band klystron; beam emission; cathode lifetime; heater; quick startup test analysis; time 4 min; time 5 min to 15 min; Cathodes; Heating; Klystrons; Power generation; Temperature measurement; Wireless communication; S-band; an emergency; klystron; quick startup;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Cross Strait Quad-Regional Radio Science and Wireless Technology Conference (CSQRWC), 2012
  • Conference_Location
    New Taipei City
  • Print_ISBN
    978-1-4673-1867-9
  • Type

    conf

  • DOI
    10.1109/CSQRWC.2012.6294982
  • Filename
    6294982