• DocumentCode
    571970
  • Title

    New half voltage and double pulse operation of the HERMES III linear induction accelerator

  • Author

    Mikkelson, K.A. ; Westfall, R.L. ; Neely, S.M. ; Harper-Slaboszewicz, V.J.

  • Author_Institution
    Sandia Nat. Labs., Albuquerque, NM, USA
  • Volume
    1
  • fYear
    1992
  • fDate
    25-29 May 1992
  • Firstpage
    486
  • Lastpage
    491
  • Abstract
    The standard operating mode produces bremsstrahlung with an endpoint energy of about 18 MeV. This paper describes a new mode with a 8.5 MeV endpoint energy and the same standard mode pulse characteristics achieved by operating only half of the accelerator at full charge with the advantage of minimal setup time. An extension of the new half voltage mode is to use the other half of the accelerator for delivering a second pulse at a later time using the same technique. This double pulse mode is ideal for beam generation which requires a long interpulse time in the millisecond regime. The beam characteristics of the two half voltage pulses are nearly identical with the nominal radiation pulse full width at half maximum of 21 ns and 10-90% risetime of 11 ns.
  • Keywords
    bremsstrahlung; collective accelerators; particle beam diagnostics; HERMES III linear induction accelerator; beam characteristics; beam generation; double pulse mode; double pulse operation; electron volt energy 8.5 MeV; endpoint energy; half voltage mode; long interpulse time; minimal setup time; nominal radiation pulse; standard mode pulse characteristics; standard operating mode; time 11 ns; time 21 ns; Anodes; Laboratories; Monitoring; Power transmission lines; Standards; Switches; Transmission line measurements;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    High-Power Particle Beams, 1992 9th International Conference on
  • Conference_Location
    Washington,DC
  • Print_ISBN
    000-0-0000-0000-0
  • Type

    conf

  • Filename
    6306526