DocumentCode
577299
Title
A new wideband transformer partial discharge online monitoring system
Author
Ye, Tian ; Yangchun, Cheng ; Dada, Wang ; Shaoquan, Zhang
Author_Institution
Beijing Key Lab. of High Voltage & EMC, North China Electr. Power Univ., Beijing, China
fYear
2012
fDate
17-20 Sept. 2012
Firstpage
604
Lastpage
607
Abstract
This paper introduces a wideband transformer partial discharge (PD) online monitoring system which can be used under the substation environment. It consists of wideband current sensors, amplifiers, filters, a digital oscilloscope and a computer. The wideband current sensors´ measuring ranges from 20kHz to 40MHz; the signal amplifiers´ frequency bandwidth is 0 ~ 100MHz, the signal gain of it can reach 100 times; the digital oscilloscope is used to acquire and display the PD pulse signal, the sampling rate is set to 100Msps, and the data length is 100M; the computer controls the whole data collection process, and the software platform was written using the Labview. Use a power frequency cycle (20 ms) as a unit for data acquisition. The data collected by the oscilloscope gets into the computer through the USB interface, after filtering, pulse extraction, pulse equivalent time-frequency parameter calculation and other processes, and then conducts the next data collection cycle. After the acquisition of data from 50 power frequency cycles, doing pulse clustering analysis based on the pulse of the equivalent time-frequency parameters. After the completing of pulse clustering analysis, conducts the same kind of pulse of statistical analysis, exclusion of pulse disturbance and fault diagnosis. It can effectively reflect the internal PD change rule under the actual working state of the transformer, can judge the severity of the transformer internal discharge to determine whether maintenance or not, then effectively improve the capacity of safe operation and reduce the maintenance costs.
Keywords
fault diagnosis; maintenance engineering; oscilloscopes; partial discharges; power transformers; sensors; substations; virtual instrumentation; Labview; PD online monitoring system; PD pulse signal; USB interface; amplifiers; data collection process; digital oscilloscope; fault diagnosis; filters; frequency bandwidth; maintenance costs; power frequency cycle; power frequency cycles; pulse clustering analysis; pulse disturbance; pulse equivalent time-frequency parameter; sampling rate; substation environment; time-frequency parameters; wideband current sensors; wideband transformer partial discharge online monitoring system; Current measurement; Partial discharges; Power transformer insulation; Sensors; Time frequency analysis; Wideband; Online Condition; Partial Discharge; Wideband;
fLanguage
English
Publisher
ieee
Conference_Titel
High Voltage Engineering and Application (ICHVE), 2012 International Conference on
Conference_Location
Shanghai
Print_ISBN
978-1-4673-4747-1
Type
conf
DOI
10.1109/ICHVE.2012.6357098
Filename
6357098
Link To Document