DocumentCode :
577582
Title :
Estimate method to solve the time lag of sintering forecast
Author :
Zhang, Tao ; Li, Fujin
Author_Institution :
Coll. of Inf., Hebei United Univ., Tangshan, China
fYear :
2012
fDate :
6-8 July 2012
Firstpage :
359
Lastpage :
361
Abstract :
Sintering end control systems generally lag, if the destination ahead of sintering, the sintering time is too long, sintering heat, so less than the blast furnace sinter production of each component content. If the backward end of sintering, sintering not fully carried out, part of the sintering machine in the ring on a cold, cold cooling ring less than the required temperature, resulting in sintering temperature as the feed belt to blast furnace burning, leading to the back process can not proceed. Using estimate method to implement burn-through point forecast can be a good solution to this problem.
Keywords :
belts; blast furnaces; combustion; cooling; forecasting theory; sintering; blast furnace burning; blast furnace sinter production; burn-through point forecast; cold cooling ring; feed belt; sintering end control system; sintering forecast; sintering heat; time lag; Bellows; Delay; Fuzzy control; Process control; Temperature control; Temperature distribution; burn-through point; fuzzy control; lag;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Intelligent Control and Automation (WCICA), 2012 10th World Congress on
Conference_Location :
Beijing
Print_ISBN :
978-1-4673-1397-1
Type :
conf
DOI :
10.1109/WCICA.2012.6357899
Filename :
6357899
Link To Document :
بازگشت