DocumentCode :
579708
Title :
Managing the complexity of a telecommunication power systems equipment replacement program
Author :
Lim, Ee Hui ; Bodi, Frank
Author_Institution :
Mission Critical Assets, Silcar Pty Ltd., Melbourne, VIC, Australia
fYear :
2012
fDate :
Sept. 30 2012-Oct. 4 2012
Firstpage :
1
Lastpage :
9
Abstract :
Telecommunication operators must manage many types and models of power equipment from many manufacturers each with different characteristics. With Telco´s globally reporting strong pressure on CAPEX reduction, it is important to develop capability not only of predicting end-of-life of equipment, but also of managing the vast number of types, makes and models used in a variety of environments. Delayed replacement results in higher service disruption risk while early replacement places considerable pressure on CAPEX budgets. We have developed an Equipment Reliability Analysis (ERA) program for telecommunication power equipment life cycle replacement. Rectifiers, batteries and UPS life data are grouped by features including technology, manufacturer make/model, life-data analysis from field failure data, and equipment tear-down analysis for life cycle replacement decisions. Replacement decisions are based on a number of inputs, including field experience, type of application, defect data and life data analysis.
Keywords :
electrical maintenance; power apparatus; rectifiers; secondary cells; telecommunication power supplies; uninterruptible power supplies; CAPEX; ERA; UP; batteries; equipment end-of-life; equipment reliability analysis program; equipment tear-down analysis; field failure data; life cycle replacement decisions; life data analysis; rectifiers; telecommunication operators; telecommunication power equipment life cycle replacement; telecommunication power systems equipment replacement program; uninterruptible power supplies; Batteries; Power system reliability; Rectifiers; Telecommunication network reliability; equipment reliability analysis; life cycle replacement;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Telecommunications Energy Conference (INTELEC), 2012 IEEE 34th International
Conference_Location :
Scottsdale, AZ
ISSN :
2158-5210
Print_ISBN :
978-1-4673-0999-8
Electronic_ISBN :
2158-5210
Type :
conf
DOI :
10.1109/INTLEC.2012.6374535
Filename :
6374535
Link To Document :
بازگشت