DocumentCode :
580904
Title :
Segregating preventive maintenance work for factory performance improvement
Author :
Kalir, Adar
Author_Institution :
Fab/Sort Manuf. Div., Intel Corp., Qiriat-Gat, Israel
fYear :
2012
fDate :
20-24 Aug. 2012
Firstpage :
646
Lastpage :
649
Abstract :
The impact of Preventive Maintenance (PM) activity on the cycle time of a specific toolset or even the entire fab can be detrimental. Hence, there is strong incentive to determining the best way to carry out the required PM work content so as to optimize cycle time. In this paper, a model is proposed that optimizes the execution of PM´s for a pre-determined PM work content, with the consideration of attached setups.
Keywords :
machinery; optimisation; preventive maintenance; production facilities; Machine Variability; PM activity; cycle time optimization; factory performance improvement; segregating preventive maintenance work; Availability; Equations; Manufacturing; Mathematical model; Preventive maintenance; Production facilities; Cycle Time; Machine Variability; Optimization; Preventive Maintenance;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Automation Science and Engineering (CASE), 2012 IEEE International Conference on
Conference_Location :
Seoul
ISSN :
2161-8070
Print_ISBN :
978-1-4673-0429-0
Type :
conf
DOI :
10.1109/CoASE.2012.6386368
Filename :
6386368
Link To Document :
بازگشت