DocumentCode :
581938
Title :
Project characteristics based buffer sizing to critical chain scheduling
Author :
Ze, Guo ; Zheng, Zheng ; Lin Shu Min ; Yang Rui Feng
Author_Institution :
Sch. of Autom. Sci. & Electr. Eng., Beihang Univ., Beijing, China
fYear :
2012
fDate :
25-27 July 2012
Firstpage :
2400
Lastpage :
2405
Abstract :
The robustness of projects, which is strongly influenced by network structures and resource requirements is easy to be overlooked by traditional critical chain scheduling/buffer management approaches. In their approaches, usually task duration is the only factor considered. This paper analyzes the effect of order strength and resource constrainedness to the buffer size, and then proposes an improved buffer sizing strategy. Experimental results show that this strategy can effectively increase the proportion of buffer consumed, decrease the deliver time of project, and assure a satisfying project makespan.
Keywords :
network theory (graphs); project management; scheduling; sizing (materials processing); supply chain management; buffer management approaches; critical chain scheduling; network structures; order strength; project characteristics based buffer sizing strategy; project makespan; project robustness; resource constrainedness; resource requirements; Abstracts; Aerospace control; Automation; Educational institutions; Electrical engineering; Electronic mail; Laboratories; Buffer Modify Strategy; Critical Chain; Order Strength; Resource Constrainedness;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Control Conference (CCC), 2012 31st Chinese
Conference_Location :
Hefei
ISSN :
1934-1768
Print_ISBN :
978-1-4673-2581-3
Type :
conf
Filename :
6390327
Link To Document :
بازگشت