DocumentCode
583475
Title
Steel-yard planning support system: Optimizing the steel-yard planning and performance evaluation with simulation
Author
Seokhyun Lee ; Jihun Yu ; Eunyoung Kim ; Woosung Choi ; Raesoo Lim ; Hokyeong Kim ; Jooho Heo
Author_Institution
Process R&D Team, STX Offshore & Shipbuilding, Changwon, South Korea
fYear
2012
fDate
17-21 Oct. 2012
Firstpage
605
Lastpage
609
Abstract
Steel ships are constructed by cutting up plates and afterwards welding them together to produce ship blocks. These blocks are again welded together in the dock or special erection place to produce a ship. Most of the shipbuilding companies have their own steel-yard to manage thousands of steel-plates which need to be supplied in a proper time. In STX Offshore & Shipbuilding, the steel-yard is divided into 148 stock zones which are called pile and four magnetic gantry cranes move the plates into, around and out of the piles when needed in production. The problem is that it is hard to manage the steel-plate piling plan efficiently, because steel supply is not constant and also production schedule of the steel varies and changes frequently. This paper describes the efforts required to schedule the efficient piling plan of the steel-plate and to verify the schedule by simulating the virtual steel-yard model. And integrated planning support system is suggested including plan scheduler and plan evaluation simulator. Finally, the paper is concluded with some recommendations.
Keywords
cranes; digital simulation; foundations; optimised production technology; plates (structures); production engineering computing; production planning; shipbuilding industry; steel; virtual manufacturing; welding; STX Offshore & Shipbuilding; dock; integrated planning support system; magnetic gantry cranes; performance evaluation; plan evaluation simulator; plan scheduler; production schedule; ship blocks; shipbuilding companies; steel ships construction; steel supply; steel-plate piling plan; steel-yard planning optimization; steel-yard planning support system; virtual steel-yard model; welding; Cranes; Job shop scheduling; Marine vehicles; Schedules; Steel; crane scheduling; discrete event simulation; dynamic programming; piling plan optimization; planning support system; steel-plate; steel-yard;
fLanguage
English
Publisher
ieee
Conference_Titel
Control, Automation and Systems (ICCAS), 2012 12th International Conference on
Conference_Location
JeJu Island
Print_ISBN
978-1-4673-2247-8
Type
conf
Filename
6393254
Link To Document