A preliminary study of the subcontractor´s risk identification for the construction projects
Author
Zaini, Azniza Ahmad ; Endut, Intan Rohani ; Shehu, Zayyana
Author_Institution
Fac. of Archit. Planning & Surveying, UiTM, Shah Alam, Malaysia
fYear
2012
fDate
23-26 Sept. 2012
Firstpage
878
Lastpage
883
Abstract
Malaysian construction Industry nowadays is facing a fraternity of problems series of delayed and abandoned projects. Currently in Malaysia, there is no formal risk management approaches in use by the subcontractors. This research intends to identify types of risks involved at project conceptual phase for the subcontractors. The findings in this research are based on the synthesis of critical literature review and data collected from semi-structured interviews. The findings shows that the most critical risks identified are financial, social, technical, natural and political risks. It is hope that the findings will assist in the development of the formal risk management for the subcontractors and hence, helps them mitigates the project risks.
Keywords
construction industry; financial management; occupational safety; politics; project management; risk management; Malaysian construction Industry; construction project risk mitigation; financial risk identification; formal risk management development; natural risk identification; political risk identification; project conceptual phase; social risk identification; subcontractor critical risk-type identification; technical risk identification; Construction industry; Delay; Interviews; Materials; Meteorology; Project management; Risk management; Construction Industry; Risk Management; Subcontractors; project risks;
fLanguage
English
Publisher
ieee
Conference_Titel
Business, Engineering and Industrial Applications (ISBEIA), 2012 IEEE Symposium on
Conference_Location
Bandung
Print_ISBN
978-1-4577-1632-4
Type
conf
DOI
10.1109/ISBEIA.2012.6423018
Filename
6423018
Link To Document