    Determining and Selecting the Optimal Sets of Risk Treatments under Project Constraints

  • Author

    Tak Wah Kwan ; Cheung, Brian

  • Author_Institution
    Hong Kong Polytech. Univ., Hong Kong, China
  • Volume
    1
  • fYear
    2012
  • fDate
    4-7 Dec. 2012
  • Firstpage
    346
  • Lastpage
    349
  • Abstract
    Risk management practices exist to help planning risk responses and identifying risk treatments, but projects usually consist of constraints and lack of resources to implement all the treatments in reality. This paper defines some common criteria to select risk treatments with due consideration of the project constraints, such as budget, resources and schedule, and uses an example to illustrate how to obtain an optimal set of risk treatments so that the treatment effect can be maximized and the overall project risk is minimized under the given constraints.
  • Keywords
    risk management; set theory; optimal sets; project constraints; risk management practices; risk treatment; Optimization; Project management; Risk management; Schedules; Software engineering; project risk management; risk methodology; risk response; risk treatment;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Software Engineering Conference (APSEC), 2012 19th Asia-Pacific
  • Conference_Location
    Hong Kong
  • ISSN
    1530-1362
  • Print_ISBN
    978-1-4673-4930-7
  • Type

    conf

  • DOI
    10.1109/APSEC.2012.13
  • Filename
    6462678