Determining and Selecting the Optimal Sets of Risk Treatments under Project Constraints
Author
Tak Wah Kwan ; Cheung, Brian
Author_Institution
Hong Kong Polytech. Univ., Hong Kong, China
Volume
1
fYear
2012
fDate
4-7 Dec. 2012
Firstpage
346
Lastpage
349
Abstract
Risk management practices exist to help planning risk responses and identifying risk treatments, but projects usually consist of constraints and lack of resources to implement all the treatments in reality. This paper defines some common criteria to select risk treatments with due consideration of the project constraints, such as budget, resources and schedule, and uses an example to illustrate how to obtain an optimal set of risk treatments so that the treatment effect can be maximized and the overall project risk is minimized under the given constraints.
Keywords
risk management; set theory; optimal sets; project constraints; risk management practices; risk treatment; Optimization; Project management; Risk management; Schedules; Software engineering; project risk management; risk methodology; risk response; risk treatment;
fLanguage
English
Publisher
ieee
Conference_Titel
Software Engineering Conference (APSEC), 2012 19th Asia-Pacific
Conference_Location
Hong Kong
ISSN
1530-1362
Print_ISBN
978-1-4673-4930-7
Type
conf
DOI
10.1109/APSEC.2012.13
Filename
6462678
Link To Document