DocumentCode :
597201
Title :
Analysis on the pull strength´s calculation method during the construction of oil pipeline directional drilling crossing the yellow river and improvement
Author :
Shi-qi Xu ; Bin Luo ; Jun Cheng ; Yuan-tai Hu
Author_Institution :
Coll. of Pet. Eng., Xi´´an Shiyou Univ., Xi´´an, China
fYear :
2012
fDate :
23-25 Nov. 2012
Firstpage :
402
Lastpage :
407
Abstract :
This paper reviewed the methods, which calculate the pull strength during directional drilling crossing construction of oil pipeline, both at home and aboard. And based on the analysis of these methods, the detailed research was given. At the same time, considering the peculiarity of this channel geologic structure and the technological requirements, the method, averaged standard method and unloading arch method, was given to calculate the maximal pull strength. It is practiced that, this method is instructive and meaningful to the directional drilling crossing construction.
Keywords :
drilling (geotechnical); geology; pipelines; tensile strength; Yellow River; averaged standard method; channel geologic structure; oil pipeline directional drilling crossing construction; pull strength calculation method; technological requirements; unloading arch method; Drag; Educational institutions; Force; Frequency modulation; Pipelines; Rivers; Standards; directional drilling crossing; pipeline laying; pull strength;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Piezoelectricity, Acoustic Waves and Device Applications (SPAWDA), 2012 Symposium on
Conference_Location :
Shanghai
Print_ISBN :
978-1-4673-4814-0
Type :
conf
DOI :
10.1109/SPAWDA.2012.6464119
Filename :
6464119
Link To Document :
بازگشت