DocumentCode
601363
Title
Precise laying of observation cable system
Author
Okatake, Y. ; Fujii, Yuka ; Nasu, M. ; Ikeuchi, Atsushi ; Takahashi, Hiroki ; Asakawa, Eiji
Author_Institution
Shinagawa East One Tower, Kokusai Cable Ship Co., Ltd., Tokyo, Japan
fYear
2013
fDate
5-8 March 2013
Firstpage
1
Lastpage
4
Abstract
A demand for laying an observation cable system on a planned route position precisely has become higher and higher. JOGMEC, JGI, OCC and KCS carried out a methane hydrate dissociation monitoring survey under the seabed by using DSS (Deep-sea Seismic System) last year. The laying position of the seismometer located in the central of the DSS was required to lay at a distance of 40 m from the methane hydrate production well at the water depth of about 1,000 m. KCS has successfully achieved the DSS laying within the targeted deviation. The paper describes the details of the developed simulation system and successful laying / burial operation.
Keywords
cable laying; cables (mechanical); dissociation; monitoring; seismology; vibrations; DSS; JGI; JOGMEC; KCS; OCC; deep-sea seismic system; methane hydrate dissociation monitoring survey; observation cable system; planned route position; Communication cables; Decision support systems; Marine vehicles; Production; Real-time systems; Transponders; Underwater cables;
fLanguage
English
Publisher
ieee
Conference_Titel
Underwater Technology Symposium (UT), 2013 IEEE International
Conference_Location
Tokyo
Print_ISBN
978-1-4673-5948-1
Type
conf
DOI
10.1109/UT.2013.6519856
Filename
6519856
Link To Document