DocumentCode
602067
Title
Investigation of paralleling Bipole II and the future Bipole III in Nelson river HVDC system
Author
Zoroofi, S. ; Suriyaarachchi, D.H.R. ; Kell, D. ; Mohaddes, M. ; Wang, Peng ; Jacobson, David
Author_Institution
TransgridSolutions Inc., Winnipeg, MB, Canada
fYear
2012
fDate
4-5 Dec. 2012
Firstpage
1
Lastpage
6
Abstract
Manitoba Hydro is currently making plans for the development of Bipole III (BPIII), a 2300MW, +/-500kV HVdc Bipole that will run from Northern Manitoba to the Load centre in the south over a length of approximately 1300km. Both LCC and VSC options are considered for the new BPIII HVdc scheme [1]-[2]. One of the features being investigated is the option to parallel the new Bipole III converters with the existing Bipole II converters on the existing Bipole II (BPII) line. This paper looks at the mechanism to parallel BPII and BPIII considering the LCC and VSC options for BPIII and any potential impact on the existing Bipole I (BPI) system.
Keywords
HVDC power convertors; hydroelectric power stations; Bipole II paralleling; HVDC Bipole; LCC; Manitoba hydroelectric; Nelson River HVDC system; VSC; future Bipole III; line commutated converters; power 2300 MW; voltage 500 kV; voltage source converter; HVDC; Line Commutated Converters (LCC); Paralleling; Voltage Source Converters (VSC);
fLanguage
English
Publisher
iet
Conference_Titel
AC and DC Power Transmission (ACDC 2012), 10th IET International Conference on
Conference_Location
Birmingham
Electronic_ISBN
978-1-84919-700-7
Type
conf
DOI
10.1049/cp.2012.1941
Filename
6521240
Link To Document