    Subsea cable projects — Minimising risks

  • Author

    Goldring, R. ; Svoma, R.

  • Author_Institution
    Cambridge Marine Ltd., Cambridge, UK
  • fYear
    2012
  • fDate
    4-5 Dec. 2012
  • Firstpage
    1
  • Lastpage
    6
  • Abstract
    The Authors have applied their combined experience of more than 50 years involvement in subsea cable projects, to present key issues and areas where effort must be applied to minimise the risk over the project life cycle. Pre-sanction engineering, manufacturing, installation and failure during operation are discussed. Specific issues are mentioned that have resulted in delay, cost escalation, reliability and availability in the past.
  • Keywords
    failure analysis; power cables; availability; cost escalation; delay; failure; installation; manufacturing; presanction engineering; project life cycle; reliability; risk minimisation; subsea cable projects; Asset Management. Condition Monitoring; FEED; Failures; HVDC; Installation. Disaster Recovery; Subsea Cables. Project Risk;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    AC and DC Power Transmission (ACDC 2012), 10th IET International Conference on
  • Conference_Location
    Birmingham
  • Electronic_ISBN
    978-1-84919-700-7
  • Type

    conf

  • DOI
    10.1049/cp.2012.1949
  • Filename
    6521248