Subsea cable projects — Minimising risks
Author
Goldring, R. ; Svoma, R.
Author_Institution
Cambridge Marine Ltd., Cambridge, UK
fYear
2012
fDate
4-5 Dec. 2012
Firstpage
1
Lastpage
6
Abstract
The Authors have applied their combined experience of more than 50 years involvement in subsea cable projects, to present key issues and areas where effort must be applied to minimise the risk over the project life cycle. Pre-sanction engineering, manufacturing, installation and failure during operation are discussed. Specific issues are mentioned that have resulted in delay, cost escalation, reliability and availability in the past.
Keywords
failure analysis; power cables; availability; cost escalation; delay; failure; installation; manufacturing; presanction engineering; project life cycle; reliability; risk minimisation; subsea cable projects; Asset Management. Condition Monitoring; FEED; Failures; HVDC; Installation. Disaster Recovery; Subsea Cables. Project Risk;
fLanguage
English
Publisher
iet
Conference_Titel
AC and DC Power Transmission (ACDC 2012), 10th IET International Conference on
Conference_Location
Birmingham
Electronic_ISBN
978-1-84919-700-7
Type
conf
DOI
10.1049/cp.2012.1949
Filename
6521248
Link To Document